SAP ABAP Package MD03 (Appl. development R/3 MPS/determin. requirements planning)
Basic Data
| Package | MD03 | ||
| Short Description | Appl. development R/3 MPS/determin. requirements planning | ||
| Super package | CRM_APPLICATION | All CRM Components Without Special Structure Packages | |
| Main package indicator | Development Package | ||
| Created on/by | 00000000 | SAP |
Package Content
| Table Name | Short Description | Table Category | Delivery Class |
|---|---|---|---|
| Document log header | TRANSP | A | |
| Document log item | TRANSP | A | |
| Material Index MRP Area for Forecast | TRANSP | A | |
| Planning File Entry, MRP Area, Long-Term Planning | TRANSP | A | |
| Planning File Entry, MRP Area | TRANSP | A | |
| Material Consumption for MRP Area | TRANSP | A | |
| Blocking argument for MRP | TRANSP | L | |
| Individual Customer Plng File Entry, MRP Area Long-Term Plng | TRANSP | A | |
| Individual Customer Planning File Entry, MRP Area | TRANSP | A | |
| Index customer order -> planned order | TRANSP | A | |
| Individual Customer Planning File Entry, Long-Term Planning | TRANSP | A | |
| Individual Customer Planning File Entry | TRANSP | A | |
| User Settings for Graphic in MRP | TRANSP | A | |
| Table with Range of Coverage Information | TRANSP | A | |
| Mapping Table for External User for MRP Evaluations | TRANSP | C | |
| Mapping Table for External User/Vendor with Default Setting | TRANSP | C | |
| MRP firming date | TRANSP | A | |
| Firming Data of MRP - MRP Area | TRANSP | A | |
| Cluster Table BOMs Explosion (Shared Buffer) | TRANSP | A | |
| Header Data for MRP Document | TRANSP | A | |
| Customizing: MRP Area Storage Location | TRANSP | C | |
| Customizing: MRP Area Subcontractor | TRANSP | C | |
| Customizing MRP Area | TRANSP | C | |
| Customizing: MRP Area Plants | TRANSP | C | |
| MRP Area for Material | TRANSP | A | |
| Multilevel Delay Calculated via Order Report | TRANSP | A | |
| Intra-Material Parallelization: Affected Materials MOD | TRANSP | A | |
| Simulative dependent requirements | TRANSP | A | |
| Cluster Table Initial Screen SRList/MRP List (Shared Buffer) | TRANSP | A | |
| Aggregated MRP table items | TRANSP | A | |
| Key User Table for Parallel Import in MD07 | TRANSP | C | |
| Conversion table for PKPS / please do not use | TRANSP | L | |
| Long-term planning: Independent requirements versions | TRANSP | A | |
| Long-term planning: Plants of planning scenario | TRANSP | A | |
| Index of the production/delivery plant in the planned order | TRANSP | A | |
| Planning scenarios in long-term planning | TRANSP | A | |
| Index project -> planned order | TRANSP | A | |
| Project number new key assignment (structure) | TRANSP | A | |
| Header record for requirements total records in MRP | TRANSP | A | |
| Item record for requirements total records in MRP | TRANSP | A | |
| Changed revision levels (for creating MRP records RM61SR00) | TRANSP | A | |
| BOM explosion number | TRANSP | A | |
| New key assignment: BOM explosion no.->New BOM explosion no. | TRANSP | A | |
| Range of coverage profile | TRANSP | C | |
| PPplanning periods: header table | TRANSP | C | |
| PP planning periods: long texts | TRANSP | C | |
| PP planning periods: schedule lines (periods) | POOL | C | |
| PP planning periods: calculation rule | POOL | C | |
| Planning file entries for goods movements | TRANSP | C | |
| Start times for MRP background programs | TRANSP | G | |
| Control: activity reqmts transfer MRP/SOP -> CO | TRANSP | C | |
| Control of sequence of the extended header in the MRP list | TRANSP | G | |
| User Settings: Sort for Table | TRANSP | L | |
| User-Setting For Field Sequence To Display A Table | TRANSP | L | |
| User Parameters for Traffic Lights Settings in MD04/MD05 | TRANSP | S | |
| User exit material selection - MRP | TRANSP | C | |
| MPS evaluation: evaluation profile | POOL | E | |
| MPS evaluation: hierarchy of MRP elements | POOL | E | |
| MPS evaluations: long texts | POOL | E | |
| MPS evaluation: user-specific layout | POOL | E | |
| MPS evaluation: user-specific schedule lines | POOL | L | |
| MPS evaluation: receipts/issues texts | POOL | E | |
| Logical Destination for Parallel Processing | TRANSP | C | |
| Evaluation Profile Ranges of Coverage | TRANSP | C | |
| Texts for Minimum Range of Coverage Profile | TRANSP | C | |
| Text Table for Extraction Mode | TRANSP | C | |
| Action control | TRANSP | C | |
| Action code text | TRANSP | E | |
| Action code description | TRANSP | E | |
| List layout and print parameters | TRANSP | C | |
| User Settings for Flexible Transaction Calls | TRANSP | L | |
| User Settings For Flexible Transaction Calls Per MRP Element | TRANSP | L | |
| Default values for MRP | POOL | L | |
| Transaction Code | Short Description | Program |
|---|---|---|
| MRP | ||
| MRP - Single-item, Multi-level - | ||
| Current Material Overview | ||
| Reorg. MRP Lists | ||
| Pegging | ||
| Collective Requirements Display | ||
| Firm Planned Orders | ||
| Create Planning Calendar | ||
| Change Planning Calendar | ||
| Display Planning Calendar | ||
| MPS | ||
| MPS - Single-item, Multi-level - | ||
| MPS - Single-item, Single-level - | ||
| MPS - Single-item, Interactive - | ||
| MPS Evaluation | ||
| MRP List Evaluation | ||
| Eval. MRP lists of MRP controller | ||
| Product Group Planning Evaluation | ||
| Cross-Plant Evaluation | ||
| Multilevel Order Report | ||
| Sales order planning | ||
| Individual project planning | ||
| Execute Action for Planned Order | ||
| BAPI planned order processing | ||
| MPS - total planning run | ||
| Start of MD06 via Report | ||
| Start MD07 by using report | ||
| MRP Controller Workflow | ||
| Evaluation Report RoCs Online | ||
| Evaluation Report Ranges of Coverage | ||
| MRP Data Extractor | ||
| MPS | ||
| Mail To Vendor | ||
| Mail to Vendor | ||
| Mail to Customer | ||
| Mail to MRP Controller | ||
| Workflow: Mail to MRP Controller | ||
| Calculation of Multilevel Delay | ||
| Display Serial Numbers | ||
| Change BOM Explosion Numbers | ||
| Maintain Project New Key Assignment | ||
| Assign New Key to WBS Elements | ||
| Long-term planning | ||
| Long-Term Planning: Total Planning | ||
| Long-term plng: single-itm, mult-lvl | ||
| Long-term plng: singl-itm, singl-lvl | ||
| Long-term planning: display MRP list | ||
| Long-term plnng: collective MRP list | ||
| Long-Term Plng: Material Overview | ||
| Reorg.MRP Lists for Long-Term Plnng | ||
| LTP: Create planned order | ||
| LTP: Change planned order | ||
| LTP: Display planned order | ||
| Calculate Sim. Initial Stock | ||
| Create planning scenario | ||
| Change planning scenario | ||
| Display planning scenario | ||
| Flexible Evaluation Long-Term Plnng | ||
| Evaluation LTP for Product Group | ||
| Make-to-order planning (LTP) | ||
| Project planning (LTP) | ||
| LTP: set up plnng file entries BATCH | ||
| LTP: delete plnng file entries BATCH | ||
| Long-term plng:plng background job | ||
| Start of MS06 via Report | ||
| Start MS07 from Report | ||
| LTP Evaluation Report RoC Online | ||
| LTP Evaluation Report Coverages | ||
| EKS Simulation: Material Selection | ||
| LTP Data Extractor | ||
| Print MRP List; Long-Term Planning | ||
| MRP at client level | ||
| MRP User Settings U444B | ||
| Control of CO Integration | ||
| MRP area | ||
| List Profile Component List | ||
| C M MRP Plant Parameters for MRP | ||
| C M MRP MRP Group | ||
| Collective availibility checkProfile | ||
| IMG Activity: SIMG_CFMENUOPP1OM0K | ||
| (empty) | ||
| (empty) | ||
| (empty) | ||
| (empty) | ||
| SAP Standard Variant | ||
Hierarchy
| Software Component | BBPCRM | BBPCRM | |
| SAP Release Created in | |||
| Application Component | CRM (AEC0000003) | Customer Relationship Management | |
| Package | MD03 | Appl. development R/3 MPS/determin. requirements planning |